Katalog Bina Mandiri Stationery Toko ATK Alat Tulis Kantor & Peralayan Sekolah lengkap
-
Gunting Kertas-Kain Joyko Scissor Murah di Jual di toko ATK GrosirStarting at IDR 5.600,00
-
Tinta Lukis Akrilik Joyko ACC-10ML-12Color ACC-12ML-12C-18C-24C 30ML/75MLStarting at IDR 13.800,00
-
Sarung Tangan Karet / Kain dapur dan luar ruangan Scotch BriteStarting at IDR 37.000,00
-
3M Post-it Dry Erase Surface DEF3X2 Rolls 600x900mm / DEF4X3 Rolls 900x1200mm / DEFSHEETS-3PK Sheets 178x287mmRating:60%Starting at IDR 129.000,00
-
-
katalog Stationery Pena Gambar Drawing Pen Sketsa/manga/arsitek terbaru 2023Starting at IDR 27.100,00
-
Sabut Pencuci Perabotan Piring Jaring Scotch BriteStarting at IDR 6.000,00
-
Isi pensil mekanik 0.5 0.7 2B HB Faber Castell lead superfineStarting at IDR 7.000,00
-
3M Post-it Page Marker 670-5AN - 670-5ANL - 671-5ANLStarting at IDR 9.600,00
-
Spidol Whiteboard papan tulis Faber Castell dengan gripStarting at IDR 13.600,00
-
Paket alat tulis ujian sekolah standar mantap akrilik Faber CastellStarting at IDR 28.300,00
-
Gunting Kertas Anak Balita Scotch 1408 | Scotch 1427 | Scotch 1428 | Scotch 1442B aman tumpul tidak tajamRating:100%Starting at IDR 23.500,00
-
Tinta Roller Refill Tembakan label harga Joyko labeller Ink 18mm 20mmStarting at IDR 4.400,00
-
Label Pengiriman Exclusive dan kartu Ucapan Thank You buat online ShopStarting at IDR 11.250,00
-
Kunci Pintu Digital Stainless Steel pakai Kartu merk Fingerspot HL-100S / HL-800TStarting at IDR 1.430.000,00
-
Pendorong Air Lantai & Jendela Scotch Brite squeegeeStarting at IDR 92.000,00
-
Klip Penjepit Kertas Joyko Bulldog Clips 3-74 (3 inci) | 6-145 (nekel 6 inci)Starting at IDR 11.500,00
-
Ring Binding - Ring Spiral Jilid Plastik Joyko Berbagai UkuranStarting at IDR 58.100,00
-
Alat Lem Tembak Panas Glue Gun Joyko GG-850 | GG-851 | GG-852 | GG-853Starting at IDR 35.700,00
Penawaran Alat Tulis Kantor Terbaik
Selain memanfaatkan belanja produk kebutuhan alat tulis kantor pada saat akhir tahun atau momen tertentu untuk mendapatkan harga yang lebih murah dan terjangkau, berbelanja di tempat yang tepat juga memudahkan Anda mendapatkan harga yang terjangkayu.
Toko alat tulis kantor grosir Jakarta hadir sebagai solusi bagi instansi maupun Anda yang ingin berbelanja segala kebutuhan alat tulis dengan harga yang terjangkau. Berbagai kebutuhan alat tulis kantor, peralatan kantor, dan perlengkapan kantor tersedia di sini.
Produk Variatif dan Harga Terjangkau
Harga yang terjangkau diberikan pada konsumen dengan tujuan untuk memenuhi segala kebutuhan konsumen. Penawaran terbaik ini merupakan komitmen bagi supplier alat tulis kantor Jakarta untuk selalu setia menyediakan produk-produk menarik.
Penawaran terbaik ini akan menunjang segala aktivitas Anda selama bekerja di kantor, sekolah, dan dalam kehidupan sehari-hari. Tak hanya hadir dengan menyediakan kebutuhan alat tulis kantor, peralatan kantor, dan perlengkapan kantor, namun juga menyedikan perabotan kantor (furniture) dan aksesoris komputer.
Anda bisa dengan mudah mendapatkan berbagai produk sesuai kebutuhan. Apalagi dilengkapi dengan katalog prpduk serta informasi harga yang akan memandu Anda mencari produk sesuai kebutuhan.
Hadir dengan Produk Berkualitas
Sebagai salah satu distributor dan agen stationery grosir murah, produk-produk yang dihadirkan tak hanya lengkap, variatif, dan terjangkau bagi semua kalangan, namun juga mengutamakan kualitas produk.
Produk-produk yang disediakan berasal dari brand dan merk ternama serta sudah dikenal luas oleh masyarakat maupun konsumen. Jadi Anda tak perlu ragu untuk berbelanja segala kebutuhan kantor di sini.
Produk-produk yang berkualitas akan mempunyai daya tahan yang cukup lama sehingga Anda sebagai konsumen dan pengguna tak perlu khawatir. Produk yang tahan lama akan menunjang kinerja Anda. Pengeluaran pun bisa ditekan sehigga lebih hemat.
Menariknya lagi, penyedia kebutuhan instansi maupun alat tulis ini hadir dengan layanan yang berkualitas pula. Anda akan dilayani dengan sepenuh hati sesuai komitmen sebagai penyedia kebutuhan kantor terlengkap dan terpercaya.
(ta.id-008)
Beli Stationery untuk Kantor Baru? Cari Tahu Tipsnya Yuk!
Ketika mendirikan kantor atau perusahaan, salah satu hal penunjang yang tidak boleh dilupakan adalah ketersediaan stationery kantor. Perlengkapan kantor merupakan benda-benda yang bisa membantu pekerjaan karyawan atau pegawai kantoran untuk bisa menyelesaikan pekerjaannya secara lebih efektif dan efisien. Terdapat ragam jenis merek perlengkapan kantor yang tersedia di toko atau grosir dengan ragam harga dari mulai yang murah, hingga yang termahal sekalipun.
Dengan ragam harga yang memang ada, tentu Kamu yang ditugaskan oleh pihak kantor untuk melakukan pembelian harus memiliki strategi jitu dalam berbelanja sehingga bisa disesuaikan dengan anggaran dari kantor. Hal ini karena kantor dan instansi seperti apapun selalu membutuhkan perlengkapan kantor dalam aktivitas pekerjaannya. Dengan melengkapi sarana dan prasarana yang ada, maka pekerjaan pun bisa lebih cepat selesai dan lebih hemat waktu. Untuk itu, bagi Kamu yang sedang berencana melakukan pembelian stationery kantor, pastikan untuk menerapkan tips ini ya:
- Tujuan penggunaan alat kantor
Ketika melakukan pemilihan alat kantor, maka hal pertama yang harus dipertimbangkan adalah tujuan dari penggunaan alat kantor tersebut. Banyak perkantoran baru yang masih bingung dalam menentukan peralatan yang memang dibutuhkan sehingga membeli benda yang bahkan sering tidak digunakan dalam jumlah banyak di toko grosir peralatan kantor. Hal ini tentu saja merugikan karena memborong benda yang tidak digunakan.
- Memilih peralatan yang sesuai
Setiap kantor memiliki bidang pekerjaan yang berbeda-beda. Meski kebutuhan akan perlengkapan kantor di semua kantor hampir sama, seperti alat tulis, fungsi pengarsipan, fungsi penyimpanan, fungsi keuangan dan lainnya, namun untuk setiap kantor harus juga memiliki tambahan peralatan kantor yang bisa mendukung bidangnya. Misalnya saja pada kantor desain, maka butuh printer laser dan scanner. Berbeda dengan kantor jasa perjalanan dimana lebih membutuhkan banyak kuitansi dan nota.
- Tingkat kegunaannya
Pasti Kamu sudah tahu dong kalau perlengkapan kantor memiliki fungsi yang berbeda-beda. Oleh karena itu, Kamu perlu membuat skala prioritas dalam daftar belanja. Membuat skala prioritas ini berguna untuk bisa membeli benda yang memang terpakai untuk kantor nantinya. Selain itu, ketika di toko, Kamu juga tidak kebingungan.
- Spesifikasi peralatan
Untuk benda sederhana seperti pulpen, kertas atau map memang Kamu tidak perlu mengetahui spesifikasinya karena hampir semua benda tersebut sama. Namun bagaimana dengan pembelian mesin kantor? Pasti Kamu butuh informasi jelasnya dong. Untuk itu, Kamu bisa menanyakan kepada pihak penjualnya tentang spesifikasi dari mesin kantor tersebut. Cakupan mesin kantor sangat luas, seperti komputer, printer, mesin penghancur kertas, mesin laminating, mesin absensi dan masih banyak lagi. Selain itu, mengingat mesin memerlukan perawatan, cari tahu juga tentang biaya yang mungkin saja keluar untuk servis dan lainnya. Proses operasi mesin dan tingkat kemudahannya juga patut dijadikan pertimbangan sehingga harus bisa dipastikan agar semua karyawan bisa mengoperasikan mesin ini agar tidak perlu biaya operator dalam menjalankannya.
Itulah beberapa tips dan pertimbangan yang perlu Kamu tahu dalam membeli ATK untuk kantor barumu. Memang agak ribet, namun semua itu akan terbayar dengan kegunaan perlengkapan kantor yang Kamu beli dan tingkat penghematannya. Untuk lebih hemat lagi, beli saja semua kebutuhan kantormu di Bina Mandiri Stationery yang merupakan grosir perlengkapan kantor dengan harga murah. Kamu bisa cek katalog dan daftar harga lengkap di online shop yang tersedia lho. (ta.id-001)

BINA MANDIRI STATIONERY
Jalan Pangeran Jayakarta Komplek Ruko 141 Blok A No.17, Mangga Dua Selatan, Sawah Besar, Daerah Khusus Ibukota Jakarta, Jakarta Pusat 10730
Telp : (021)6252421
Email : admin@alattulis.id
Whatsapp:
0811 9227169
0811 9227168
0896-7551-7760

katalog Lengkap alat tulis post-it 2025

Katalog Harga ATK merk: 3M Post-it dan 3M Scotch pertanggal 1 Februari 2025
khusus untuk custumer: User ( Foxtrot )
| Nama Produk Alat Tulis | Satuan | Harga |
|---|---|---|
| 3M Post-it 680-9 Flags Sign Here | Pcs | 21.900 |
| 3M Post-it 670-5ASST Page Marker 15 x 50 mm 500 Sheets | Pcs | 39.800 |
| 3M Post-it 660 Sticky Notes Yellow Line 102 x 152 mm | Pcs | 36.100 |
| 3M Post-it 657 Sticky Notes Yellow 76 x 102 mm | Pad | 20.200 |
| 3M Post-it 656 Sticky Notes Yellow | Pad | 10.400 |
| 3M Post-it 655 Sticky Notes Yellow 76 x 127 mm | Pad | 19.500 |
| 3M Post-it 654-5AN Sticky Notes Neon 76 x 76 mm 500 Sheets | Pack | 66.500 |
| 3M Post-it 653-AN Sticky Notes Neon Colour - 12Pad | Pack | 73.700 |
| 3M Post-it 654-1MP CW Sticky Notes 76 x 76 mm Millenial Pink | Pad | 11.700 |
| 3M Post-it 654-1CB Sticky Notes 76 x 76 mm Cloud Blue | Pad | 11.700 |
| 3M Scotch 110-M25 Extreme Mounting Tape 25mm x 4m | Roll | 61.500 |
| 3M Scotch 110-M12 Indor Mounting Tape 12mm x 4m | Roll | 38.000 |
| 3M Scotch 810 Magic tape 3/4 inch x 36Y | Roll | 31.000 |
| 3M Scotch 810 Magic tape 1/2 inch x 36Y | Roll | 25.000 |
-
Krayon Putar / Screw Crayon Joyko CR-12mini | TWCR-12S | CR-24mini | TWCR-24SStarting at IDR 23.000,00
-
Alat Pel Lantai - Sapu dan Sweeper Scotch BriteStarting at IDR 30.000,00
-
Kain Lap Pembersih Serbaguna Micro Fiber Scotch BriteStarting at IDR 20.000,00
-
Alat Hitung Manual Zikir Tasbih Hand Tally Counter Joyko HC-4D | HC-4DJA | HC-5Starting at IDR 15.600,00
-
Krayon Halus Joyko Dengan Aneka Warna Untuk Mewarnai Gambar SLC-A-12 | SLC-A-12Starting at IDR 31.100,00
-
Kartu Flashcard Edukasi Anak Pilihan 16 temaStarting at IDR 13.500,00
-
Magnet Whiteboard 20mm 30mm 40mm Joyko MN-1 MN-20-8 MN-30-5 MN-40-4Starting at IDR 7.100,00
-
Notebook Spiral Mini A5 dan A6 hvs 70gsm 50 Halaman 12 TemaStarting at IDR 5.400,00
\Daftar harga perlengkapan kantor kategori perlengkapan Jilid spiral kawat
Daftar harga perlengkapan kantor kategori perlengkapan Jilid spiral kawat
Katalog Daftar Harga ATK Spiral Jilid Kawat merk: JBI Pertanggal 1 Januari 2025
khusus untuk custumer: FOXTROT
pertanggal
| Nama Produk Alat Tulis | Satuan | Harga |
|---|---|---|
| JBI Spiral Kawat No. 20 Pitch 2:1 (1 1/4") Folio | Box | 1.755.000 |
| JBI Spiral Kawat No. 20 Pitch 2:1 (1 1/4") A4 | Box | 1.565.000 |
| JBI Spiral Kawat No. 18 Pitch 2:1 (1 1/8") Folio | 1.490.000 | |
| JBI Spiral Kawat No. 18 Pitch 2:1 (1 1/8") A4 | 1.315.000 | |
| JBI Spiral Kawat No. 16 Pitch 2:1 (1") Folio | 758.000 | |
| JBI Spiral Kawat No. 16 Pitch 2:1 (1") A4 | 671.000 | |
| JBI Spiral Kawat No. 14 Pitch 2:1 (7/8") Folio | 641.000 | |
| JBI Spiral Kawat No. 14 Pitch 2:1 (7/8") A4 | 567.000 | |
| JBI Spiral Kawat No. 12 Pitch 2:1 (3/4") Folio | 515.000 | |
| JBI Spiral Kawat No. 12 Pitch 2:1 (3/4") A4 | 491.000 | |
| JBI Spiral Kawat No. 10 Pitch 2:1 (5/8") Folio | 415.000 | |
| JBI Spiral Kawat No. 10 Pitch 2:1 (5/8") A4 | 369.000 | |
| JBI Spiral Kawat No. 09 Pitch 3:1 (9/16") Folio | 388.000 | |
| JBI Spiral Kawat No. 09 Pitch 3:1 (9/16") A4 | 358.000 | |
| JBI Spiral Kawat No. 08 Pitch 3:1 (1/2") Folio | 329.000 | |
| JBI Spiral Kawat No. 08 Pitch 3:1 (1/2") A4 | 295.000 | |
| JBI Spiral Kawat No. 07 Pitch 3:1 (7/16") Folio | 280.000 | |
| JBI Spiral Kawat No. 07 Pitch 3:1 (7/16") A4 | 258.000 | |
| JBI Spiral Kawat No. 06 Pitch 3:1 (3/8") Folio | 198.000 | |
| JBI Spiral Kawat No. 06 Pitch 3:1 (3/8") A4 | 183.000 | |
| JBI Spiral Kawat No. 05 Pitch 3:1 (5/16") Folio | 176.000 | |
| JBI Spiral Kawat No. 05 Pitch 3:1 (5/16") A4 | 161.000 | |
| JBI Spiral Kawat No. 04 Pitch 3:1 (1/4") Folio | 135.500 | |
| JBI Spiral Kawat No. 04 Pitch 3:1 (1/4") A4 | 124.000 |
Price List Grosir Stationery Murah Terlengkap dan Terbaru
Temukan berbagai kebutuhan alat tulis kantor dan sekolah dengan harga grosir termurah hanya di toko Bina Mandiri Stationery! Kami menyediakan beragam produk stationery berkualitas tinggi dengan pilihan merek terkenal maupun produk lokal yang ekonomis. Mulai dari pulpen, pensil, penghapus, penggaris, spidol, hingga perlengkapan kantor seperti kertas HVS, map, binder, dan buku tulis, semuanya bisa Anda dapatkan dengan harga spesial untuk pembelian partai besar. Setiap produk yang kami tawarkan telah melalui proses seleksi kualitas sehingga tetap awet, nyaman digunakan, dan tampil menarik.
Kami memahami bahwa kebutuhan alat tulis tidak hanya dibutuhkan oleh pelajar, tetapi juga oleh perusahaan, instansi, dan toko ritel. Karena itu, kami memberikan price list grosir stationery murah yang transparan dan kompetitif, lengkap dengan diskon tambahan untuk pembelian dalam jumlah tertentu. Anda dapat dengan mudah membandingkan harga satuan maupun grosir untuk menentukan pilihan terbaik sesuai dengan anggaran Anda.
Selain harga yang bersahabat, kami juga memberikan layanan pengiriman cepat ke seluruh Indonesia, dengan opsi pengiriman ekspres maupun kargo untuk pesanan besar. Kami percaya bahwa kepuasan pelanggan adalah prioritas utama, sehingga kami selalu berupaya menjaga stok produk agar tetap tersedia dan memperbarui daftar harga secara berkala agar sesuai dengan kondisi pasar.
Jadi, bagi Anda yang mencari supplier alat tulis murah, distributor stationery untuk toko, atau kebutuhan kantor, di sinilah tempatnya. Dapatkan katalog lengkap dan price list grosir stationery murah terbaru kami untuk memastikan Anda memperoleh kualitas terbaik dengan harga paling hemat.
(pg-Blogspot-073)
Dapatkan Price List Murah Perlengkapan Kantor Terkini
Apakah ada toko yang menyediakan price list murah perlengkapan kantor terkini? Tentu saja, ada namun akan sangat jarang kita temui. Salah satunya yang menyediakan adalah di Bina Mandiri Stationery. Kami sebagai salah satu distributor perlengkapan kantor terlengkap yang pernah ada, akan memberikan banyak keringanan dan kemudahan bagi anda yang ingin berbelanja berbagai peralatan kantor, sekolah atau tempat usaha yang lain dengan harga sangat terjangkau dan pelayanan yang ramah.
Perlengkapan kantor biasanya terdiri dari banyak barang yang bisa meningkatkan produktivitas dan kreativitas para pegawainya. Bila kita mau melihat price list murah perlengkapan kantor yang sudah ada, maka disitu akan kelihatan setiap item barang akan terdiri dari berbagai macam merk yang bisa anda pilih sesuai keinginan. Tidak perlu paling mahal karena belum tentu yang mahal tersebut kualitasnya bagus. Bila anda jeli maka beberapa merk sudah mempunyai kualitas sangat bagus dengan harga yang terjangkau, sehingga bisa menghemat pengeluaran kantor.
Ketersediaan barang yang kami miliki sampai dengan saat ini bisa dibilang komplit dan lengkap, karena kami secara rutin melakukan penambahan item barang setiap kali stok barang tertentu mulai menipis. Adapun untuk keseluruhan barang yang kami miliki bisa dicek langsung pada price list murah perlengkapan kantor yang sudah tersedia. Setiap item yang disebutkan disitu berarti barangnya memang ready stock dan bisa dibeli oleh konsumen secara langsung.
Selain sebagai distributor perlengkapan kantor paling lengkap, setiap barang yang ada di tempat kami selalu memenuhi kriteria kualitas yang tinggi. Contoh barang perlengkapan kantor yang bisa anda pilih adalah:
- Filling kabinet dengan bermacam merk,
- Meja dan kursi kantor,
- Mesin fax atau telepon serta masih banyak lagi lainnya yang bisa anda lihat pada price list murah perlengkapan kantor di tempat kami.
(ta.id-010)
katalog perlengkapan kantor 2025 merk SDI
katalog perlengkapan kantor 2025 merk SDI
Katalog Daftar Harga ATK merk: SDI Pertanggal 1 Januari 2025
khusus untuk custumer: Umum
pertanggal
| Nama Produk Alat Tulis | Satuan | Harga |
|---|---|---|
| SDI 1009 Cutting Mat (A1 / 36" x 24") | Pcs | 267.000 |
| SDI 1008 Cutting Mat (A2 / 24" x 18") | Pcs | 129.000 |
| SDI 1007 Cutting Mat (A3 / 18" x 12") | Pcs | 66.000 |
| SDI 1005 Cutting Mat (A4 / 12" x 9") | Pcs | 36.000 |
| SDI 1404 Snap Blade (L-150) | Pcs | 6.500 |
| SDI 0425 Cutter Knife (L-500) | Pcs | 38.000 |
| SDI 6765 Letter Opener Blister Packs | Pcs | 16.000 |
| SDI 1102 Stapler No.10 | Pcs | 14.000 |
| SDI 1105 Stapler No.10 | Pcs | 21.000 |
| SDI 1111 Stapler No.10 | Pcs | 28.000 |
| SDI 0206 Spring Clips (6") Stainless Steel (Paper Clips) | Pcs | 17.000 |
| SDI 1403 Snap Blade (A-100) | Tube | 3.500 |
| SDI 4294 Magnetic Hooks (S) 37 mm | Pcs | 32.500 |
| SDI 4293 Magnetic Hooks (B) 60 mm | Pcs | 48.000 |
| SDI 4287 Magnetic Clips (B) 45 x 50 mm | Pcs | 47.000 |
| SDI 4286 Magnetic Clips (M) 35 x 40 mm | Pcs | 40.000 |
| SDI 4285 Magnetic Clips (S) 30 x 35 mm | Pcs | 38.000 |
| SDI 1303 Magnetic Clip Dispenser (Magnet) | Pcs | 22.000 |
| SDI 1302 Magnetic Clip Dispenser (Magnet) | Pcs | 18.000 |
| SDI 1143 Long Reach Heavy Duty Stapler 12L/24 (Max 240 Lbr) | Pcs | 1.247.000 |
ta.id-page-id-1201#












































































